| Year | 2001 |
| Rated output (MW) | 30,0 |
| Number of turbines | 20 |
| Plant type | GE 1,5sl |
| Operator | SachsenFonds |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 2003 |
| Rated output (MW) | 28,8 |
| Number of turbines | 20 |
| Plant type | NM 72C/1500, NM 64C/1500, NM 52/900 |
| Operator | SachsenFonds |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 2007 |
| Operator | Babcock & Brown |
| RENERCO's contribution: Technical Consulting |
|
Feasibility study: biomass power plant
| Year | 2007 |
| Operator | Schradenbiogas |
| RENERCO's contribution: Technical Consulting |
|
Due diligence of a decentral ethanol plants

| Year | 2005 |
| Operator | Babcock & Brown |
| RENERCO's contribution: Technical Consulting |
|
Due diligence biogas plants
| Year | 2006 |
| Operator | Schradenbiogas |
| RENERCO's contribution: Technical Consulting |
|
Due Diligence
| Year | 2002 |
| Operator | BVT |
| RENERCO's contribution: Technical Consulting |
|
Feasibility study: development of biomass power plants
| Year | 2008 |
| Rated output (MW) | 22,0 |
| Number of turbines | 11 |
| Plant type | Vestas V90 |
| Operator | Babcock & Brown |
| RENERCO's contribution: Technical Consulting |
|
Technical controlling during construction phase and acceptance
| Year | 2008 |
| Rated output (MW) | 8,0 |
| Number of turbines | 4 |
| Plant type | Vestas V90 |
| Operator | Infigen |
| RENERCO's contribution: Technical Consulting |
|
Technical controlling during construction phase, acceptance and operational phase
| Year | 2007 |
| Rated output (MW) | 6,0 |
| Number of turbines | 7 |
| Plant type | Gamesa G58 |
| Operator | KGAL |
| RENERCO's contribution: Operations Management Technical Consulting |
|
Due diligence/contract negotiations

| Year | 2011 |
| Rated output (MWp) | 0,95 |
| Module technology | Poly-cristalline, Yingli |
| Inverter | Central inverter, Sputnik |
| Operator | Obton A/S |
| RENERCO's contribution: Turnkey Construction |
|

| Year | 2011 |
| Rated output (MWp) | 0,9 |
| Module technology | Poly-cristalline, Yingli |
| Inverter | Central inverter, Sputnik |
| Operator | Obton A/S |
| RENERCO's contribution: Turnkey Construction |
|

| Year | 2011 |
| Rated output (MWp) | 0,58 |
| Module technology | Poly-crystalline, Yingli |
| Inverter | Central inverter, Sputnik |
| Operator | Obton A/S |
| RENERCO's contribution: Turnkey Construction |
|
| Year | 2003 |
| Operator | BVT |
| RENERCO's contribution: Technical Consulting |
|
Feasibility study: landfill gas plant
| Year | 2009 |
| Rated output (MWp) | 3,3 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | Conergy |
| Operator | HCI |
| RENERCO's contribution: Technical Consulting |
|
Due diligence

| Year | 2009 |
| RENERCO's contribution: Site Development |
|
Drilling depth: ca. 4.000m, Drilling execution: 2009, Commissioning power plant: 2012, Planned electrical output power plant: approx. 5,5 MW, Temperature: >135°C, Capacity: >100 l/sec.

| Year | 2005 |
| Rated output (MW) | 27,0 |
| Number of turbines | 18 |
| Plant type | Nordex S70 / Nordex S77 |
| Operator | KGAL |
| Loan Capital Financing | Hypo Alpe Adria Leasing |
| Investment (Million €) | 30,0 |
| RENERCO's contribution: Site Development Operations Management |
|

| Year | 2011 |
| Rated output (MW) | 12,5 |
| Plant type | Nordex N90 |
| Operator | KGAL |
| RENERCO's contribution: Operations Management Technical Consulting |
|
Due Diligence

| Year | 2000 |
| Rated output (MW) | 31,5 |
| Number of turbines | 21 |
| Plant type | GE 1,5sl |
| Operator | BVT |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 2003 |
| Rated output (MW) | 16,0 |
| Number of turbines | 8 |
| Plant type | Vestas V80 |
| Operator | SachsenFonds |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 2008 |
| Rated output (MW) | 4,0 |
| Number of turbines | 2 |
| Plant type | Gamesa G80 |
| Operator | KGAL |
| RENERCO's contribution: Operations Management Technical Consulting |
|
Due diligence/contract negotiations
| Year | 2010 |
| Rated output (MW) | 6,0 |
| Number of turbines | 3 |
| Plant type | Vestas V90 |
| Operator | RENERCO |
| Loan Capital Financing | DKB Deutsche Kreditbank |
| Investment (Million €) | 10,5 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management Electricity Generation |
|
| Year | 2011 |
| Rated output (MW) | 10 |
| Number of turbines | 5 |
| Plant type | Vestas V90 |
| Operator | RENERCO |
| Investment (Million €) | 14,4 |
| RENERCO's contribution: Site Development |
|

| Year | 2009 |
| Rated output (MWp) | 0,8 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | SMA |
| Operator | Privater Investor |
| Loan Capital Financing | Spar- und Leihkasse zu Bredstedt |
| Investment (Million €) | 3,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|
| Year | 2010 |
| Rated output (MWp) | 39,6 |
| Module technology | Polycrystalline, Q-Cells |
| Inverter | Schneider Electric |
| Operator | NIBC |
| RENERCO's contribution: Technical Consulting |
|
Technical Management
| Year | 1999 |
| Rated output (MW) | 12,0 |
| Number of turbines | 12 |
| Plant type | NEG Micon NM 1000 |
| Operator | BVT |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase

| Year | 2011 |
| Rated output (MWp) | 0,5 |
| Module technology | Poly crystalline, Solon |
| Inverter | Siemens string inverter |
| Operator | Gemeinde Fuchstal |
| Investment (Million €) | 0,9 |
| RENERCO's contribution: Turnkey Construction |
|
| Year | 2010 |
| Rated output (MWp) | 1,6 |
| Module technology | Thin film, a-Si, GS-Solar |
| Inverter | Siemens |
| RENERCO's contribution: Technical Consulting |
|
Due Diligence
| Year | 2002 |
| Rated output (MW) | 5,3 |
| Number of turbines | 7 |
| Plant type | Frisia F48 |
| Operator | Treuwind GmbH&Co. WP Geisleden/ HVB |
| RENERCO's contribution: Technical Consulting |
|
Conceptual consulting of the bank to restructure the project
| Year | 2010 |
| Rated output (MWp) | 2,0 |
| Module technology | Thin film, a-Si, GS-Solar |
| Inverter | Siemens |
| RENERCO's contribution: Technical Consulting |
|
Due Diligence
| Year | 2010 |
| Rated output (MW) | 16,0 |
| Number of turbines | 8 |
| Plant type | Enercon E82 |
| RENERCO's contribution: Technical Consulting |
|
Due Diligence

| Year | 2011 |
| Rated output (MW) | 18 |
| Number of turbines | 9 |
| Plant type | Vestas V90 |
| Operator | RENERCO |
| Investment (Million €) | 27 |
| RENERCO's contribution: Site Development Turnkey Construction Electricity Generation |
|
| Year | 2006 |
| Rated output (MVA) | 31,5 |
| Operator | RENERCO |
| Loan Capital Financing | Sachsen LB |
| Investment (Million €) | 1,3 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management Electricity Generation |
|
| Year | 2007 |
| Rated output (MW) | 3,0 |
| Number of turbines | 2 |
| Plant type | Nordex S70 |
| Operator | Infigen |
| RENERCO's contribution: Technical Consulting |
|
Technical controlling during construction phase, acceptance and operational phase
| Year | 1997 |
| Rated output (MW) | 74,0 |
| Operator | BVT |
| Loan Capital Financing | HypoVereinsbank |
| Investment (Million €) | 229,6 |
| RENERCO's contribution: Technical Consulting |
|
Lignite (brown coal) - fired PFBC-plant (Pressurised Fluidized Bed Combustion)

| Year | 2003 |
| Rated output (MW) | 12,0 |
| Number of turbines | 8 |
| Plant type | GE 1,5sl |
| Operator | LHI Leasing |
| RENERCO's contribution: Operations Management Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 2008 |
| Rated output (MWp) | 5,8 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | Conergy |
| Operator | HCI |
| RENERCO's contribution: Technical Consulting |
|
Technical controlling during construction phase and acceptance
| Year | 2007 |
| Rated output (MW) | 12,0 |
| Number of turbines | 6 |
| Plant type | Vestas V80 |
| Operator | Infigen |
| RENERCO's contribution: Technical Consulting |
|
Technical controlling during construction phase, acceptance and operational phase
| Year | 1998 |
| Rated output (MW) | 1,2 |
| Number of turbines | 2 |
| Plant type | Enercon E-40 |
| Operator | Privater Investor |
| Loan Capital Financing | HypoVereinsbank |
| Investment (Million €) | 2,0 |
| RENERCO's contribution: Site Development Turnkey Construction |
|

| Year | 2008 |
| Rated output (MVA) | 31,5 |
| Operator | SachsenFonds |
| RENERCO's contribution: Operations Management |
|
| Year | 1995 |
| Operator | BVT |
| Loan Capital Financing | HypoVereinsbank |
| Investment (Million €) | 87,9 |
| RENERCO's contribution: Technical Consulting |
|
total 167.000 EGW (= Equivalent to the number of citizens)

| Year | 2009 |
| RENERCO's contribution: Site Development |
|
Drilling depth: ca. 4.000m, Drilling execution: 2009/2010, Commissioning power plant: 2012, Planned electrical output power plant: approx. 5,5 MW, Temperature: >135°C, Capacity: >100 l/sec.
| Year | 2007 |
| Rated output (MVA) | 31,5 |
| Operator | RENERCO |
| Loan Capital Financing | Sachsen LB |
| Investment (Million €) | 1,3 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|

| Year | 2007 |
| Rated output (MWp) | 4,4 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | Xantrex |
| Operator | BVT |
| Loan Capital Financing | Sachsen LB |
| Investment (Million €) | 16,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|
| Year | 2002 |
| Rated output (MW) | 30,6 |
| Number of turbines | 17 |
| Plant type | Enercon E-66 |
| Operator | Bürgerwindpark Königsmoor/HVB |
| RENERCO's contribution: Technical Consulting |
|
Technische Controlling während Bauphase/Abnahme/Betriebsphase

| Year | 2010 |
| Rated output (MW) | 1,1 |
| Module technology | Polycrystalline, Yingli |
| Operator | Private Investor |
| Investment (Million €) | 2,6 |
| RENERCO's contribution: Turnkey Construction |
|
| Year | 2008 |
| Rated output (MW) | 20,0 |
| Number of turbines | 10 |
| Plant type | Vestas V90 |
| Operator | Infigen |
| RENERCO's contribution: Technical Consulting |
|
Technical controlling during construction phase, acceptance and operational phase
| Year | 2008 |
| Rated output (MW) | 10,0 |
| Number of turbines | 5 |
| Plant type | Vestas V90 |
| Operator | Infigen |
| RENERCO's contribution: Technical Consulting |
|
Technical controlling during construction phase, acceptance and operational phase

| Year | 2009 |
| Rated output (MWp) | 3,6 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | SMA |
| Operator | Pfalzsolar |
| Loan Capital Financing | DKB |
| Investment (Million €) | 11,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|
| Year | 2009 |
| Rated output (MWp) | 52,8 |
| Module technology | Dünnschicht, CdTe, First Solar |
| Inverter | SMA |
| Operator | Wealthcap |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, acceptance, technical controlling during operational phase

| Year | 2011 |
| Rated output (MWp) | 1 |
| Module technology | First Solar, Dünnschicht |
| Inverter | SMA |
| Operator | 7c Solarparken B.V. |
| Loan Capital Financing | Stadtsparkasse Fürstenfeldbruck |
| Investment (Million €) | 2 |
| RENERCO's contribution: Turnkey Construction Operations Management |
|
| Year | 2007 |
| Operator | Babcock & Brown |
| RENERCO's contribution: Technical Consulting |
|
Technical evaluation of biodiesel production plants
| Year | 2000 |
| Rated output (MW) | 0,6 |
| Number of turbines | 1 |
| Operator | BVT |
| RENERCO's contribution: Technical Consulting |
|
Feasibility study of wind powered seawater desalination stations
| Year | 2004 |
| Rated output (MW) | 14,4 |
| Number of turbines | 8 |
| Plant type | Enercon E-66 |
| Operator | SachsenFonds |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase

| Year | 2010 |
| Rated output (MW) | 2,0 |
| Number of turbines | 1 |
| Plant type | Enercon E-82 |
| Operator | RENERCO |
| Loan Capital Financing | Saar LB |
| Investment (Million €) | 3,5 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management Electricity Generation |
|

| Year | 2009 |
| Rated output (MW) | 6,0 |
| Number of turbines | 4 |
| Plant type | Fuhrländer FL MD 77 |
| Operator | Enovos |
| Loan Capital Financing | Saar LB |
| Investment (Million €) | 10,5 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|

| Year | 2010 |
| Rated output (MWp) | 2,3 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | SMA |
| Operator | Investor |
| Loan Capital Financing | Unicredit |
| Investment (Million €) | 7,2 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|
| Year | 2008 |
| Rated output (MWp) | 3,3 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | Conergy |
| Operator | HCI |
| RENERCO's contribution: Technical Consulting |
|
Technical controlling during construction phase and acceptance
| Year | 1994 |
| Rated output (MW) | 19,5 |
| Number of turbines | 13 |
| Plant type | Nordex S70 / Nordex S77 |
| Operator | KGAL |
| Loan Capital Financing | HSH Nordbank |
| Investment (Million €) | 22,3 |
| RENERCO's contribution: Site Development Operations Management |
|
| Year | 2009 |
| Rated output (MWp) | 2,6 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | Conergy |
| Operator | HCI |
| RENERCO's contribution: Technical Consulting |
|
Due diligence

| Year | 2009 |
| Rated output (MWp) | 1,2 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | SMA |
| Operator | Industrieller Investor |
| Loan Capital Financing | Spar- und Leihkasse zu Bredstedt |
| Investment (Million €) | 4,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|
| Year | 2007 |
| Rated output (MW) | 8,75 |
| Number of turbines | 7 |
| Plant type | DEWind D6 |
| Operator | BVT |
| RENERCO's contribution: Technical Consulting |
|
Technical cosulting at the end of warranty
| Year | 2010 |
| Rated output (MW) | 7,5 |
| Number of turbines | 10 |
| Plant type | Südwind S46 |
| Operator | UniCredit |
| RENERCO's contribution: Technical Consulting |
|
Value expertise for sale
| Year | 2002 |
| Rated output (MW) | 13,5 |
| Number of turbines | 9 |
| Plant type | Nordex S70 |
| Operator | SachsenFonds |
| RENERCO's contribution: Operations Management Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase

| Year | 2008 |
| Rated output (MWp) | 3,0 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | SMA |
| Operator | Privat Investor |
| Loan Capital Financing | LBBW |
| Investment (Million €) | 11,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|
| Year | 2007 |
| Rated output (MWp) | 6,0 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | Xantrex |
| Operator | SachsenFonds |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, acceptance, technical controlling during operational phase

| Year | 2009 |
| Rated output (MWp) | 7,2 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | Schneider Electric |
| Operator | LHI |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, acceptance

| Year | 2006 |
| Rated output (MW) | 8,0 |
| Number of turbines | 4 |
| Plant type | Enercon E-70 |
| Operator | KGAL |
| Loan Capital Financing | HypoAlpeAdria Leasing |
| Investment (Million €) | 10,5 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|

| Year | 2007 |
| Rated output (MW) | 1,5 |
| Number of turbines | 1 |
| Plant type | Nordex S77 |
| Operator | KGAL |
| Loan Capital Financing | HypoAlpeAdria Leasing |
| Investment (Million €) | 2,1 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management |
|

| Year | 1993 |
| Rated output (MW) | 2,6 |
| Number of turbines | 9 |
| Plant type | Vestas V27, Vestas V39 |
| Operator | BVT |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 2005 |
| Rated output (MW) | 54,0 |
| Number of turbines | 27 |
| Plant type | Enercon E-70 |
| Operator | Enercon |
| Investment (Million €) | 65,0 |
| RENERCO's contribution: Site Development |
|

| Year | 2010 |
| Rated output (MWp) | 0,3 |
| Module technology | Polycrystalline, Total Energie |
| Inverter | SMA |
| Operator | Wealthcap |
| RENERCO's contribution: Technical Consulting |
|
Technical inspection by end of warranty period
| Year | 2008 |
| Rated output (MW) | 8,0 |
| Number of turbines | 4 |
| Plant type | Gamesa G80 |
| Operator | KGAL |
| RENERCO's contribution: Operations Management Technical Consulting |
|
Due diligence/contract negotiations

| Year | 2007 |
| Rated output (MW) | 16 |
| Number of turbines | 8 |
| Plant type | Enercon E-70 |
| Operator | DIF |
| Loan Capital Financing | Sachsen LB |
| Investment (Million €) | 26,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management Technical Consulting |
|
Consulting for the implementation to conform to grid code requirements
| Year | 2011 |
| Rated output (MW) | 2,3 |
| Number of turbines | 1 |
| Plant type | Enercon E-82 |
| Operator | RENERCO |
| Investment (Million €) | 3,6 |
| RENERCO's contribution: Site Development Turnkey Construction |
|

| Year | 1994 |
| Rated output (MW) | 1,7 |
| Number of turbines | 2 |
| Plant type | Gamesa G52 / Gamesa G58 |
| Operator | KGAL |
| RENERCO's contribution: Operations Management Technical Consulting |
|
Due diligence/contract negotiations

| Year | 2007 |
| Rated output (MW) | 10,0 |
| Number of turbines | 5 |
| Plant type | Repower MM82 |
| Operator | RENERCO |
| Loan Capital Financing | Sachsen LB |
| Investment (Million €) | 16,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management Electricity Generation |
|

| Year | 2009 |
| Rated output (MW) | 14,0 |
| Number of turbines | 7 |
| Plant type | Enercon E-82 |
| Operator | RENERCO |
| Loan Capital Financing | LBBW |
| Investment (Million €) | 26,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management Electricity Generation |
|

| Year | 2007 |
| Rated output (MW) | 4,0 |
| Number of turbines | 2 |
| Plant type | Enercon E-70 |
| Operator | RENERCO |
| Loan Capital Financing | LBBW |
| Investment (Million €) | 6,0 |
| RENERCO's contribution: Site Development Turnkey Construction Operations Management Electricity Generation |
|

| Year | 1998 |
| Rated output (MW) | 48,0 |
| Number of turbines | 32 |
| Plant type | NEG Micon NM 1500 |
| Operator | BVT |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 1997 |
| Operator | BVT |
| Loan Capital Financing | HypoVereinsbank |
| Investment (Million €) | 40,4 |
| RENERCO's contribution: Technical Consulting |
|
Maintenance and service station for 80 low-base-trams
| Year | 2002 |
| Rated output (MW) | 14,0 |
| Number of turbines | 7 |
| Plant type | Vestas V80 |
| Operator | SachsenFonds |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 2006 |
| Operator | Babcock & Brown |
| RENERCO's contribution: Technical Consulting |
|
Due diligence Thüringer Methylesterwerke
| Year | 2011 |
| Rated output (MW) | 30 |
| Number of turbines | 12 |
| Plant type | Nordex N100 |
| Operator | KGAL |
| RENERCO's contribution: Technical Consulting |
|
Due diligence
| Year | 2002 |
| Rated output (MW) | 31,5 |
| Number of turbines | 21 |
| Plant type | Nordex S70 |
| Operator | SachsenFonds |
| RENERCO's contribution: Operations Management Technical Consulting |
|
Due diligence/contract negotiations, technical controlling during construction phase, acceptance and operational phase
| Year | 1999 |
| Rated output (MW) | 371,0 |
| Operator | BVT |
| Loan Capital Financing | HypoVereinsbank |
| Investment (Million €) | 536,9 |
| RENERCO's contribution: Technical Consulting |
|
Pooling of five co-generation plants (Dessau, Stendal, Stassfurt, Neubranden-burg, Schwerin) in one project company

| Year | 2007 |
| Rated output (MWp) | 40,0 |
| Module technology | Thin film, CdTe, First Solar |
| Inverter | SMA |
| Operator | SachsenFonds |
| RENERCO's contribution: Technical Consulting |
|
Due diligence/contract negotiations, acceptance, technical controlling during operational phase
| Year | 2011 |
| Rated output (MWp) | 1,1 |
| Module technology | Poly-crystalline, REC |
| Inverter | Central inverter, Converteam |
| Operator | Oldeborg Solar GmbH |
| RENERCO's contribution: Technical Consulting |
|
Wind Energy
Photovoltaics
Geothermal Energy
Bioenergy
Infrastructure/
Cogeneration plants
Site Development
Turnkey Construction
Operations Management
Technical Consulting
Electricity Generation