Selected reference projects Geothemal Energy
| Dublett Drilling Dürrnhaar | |
|---|---|
| Bavaria / Germany | |
| Drilling depth: | ca. 4.000 m |
| Planned electrical output power plant: | ca. 5,5 MW |
| Drilling execution: | 2009 |
| Commissioning power plant: | 2012 |
| Temperature / Capacity: | >135°C / >100 l/sec |
RENERCO's contribution:
Project Development
Dublett Drilling Dürrnhaar
Bavaria / Germany
| Dublett Drilling Kirchstockach | |
|---|---|
| Bavaria / Germany | |
| Drilling depth: | ca. 4.000 m |
| Planned electrical output power plant: | ca. 5,5 MW |
| Drilling execution: | 2009/2010 |
| Commissioning power plant: | 2012 |
| Temperature / Capacity: | >135°C / >100 l/sec |
RENERCO's contribution:
Project Development
Dublett Drilling Kirchstockach
Bavaria / Germany